The design removes direct tool access from a high-capability planner. Instead, that planner creates a structured request containing its alleged goal, quoted user request, allowed files and network destinations, and expected failure behavior. A separate executor and deterministic monitor then check operations against the contract. In one reported…
Inspect the ClaimsCase · DiggingBeagle record
Intent Contracts constrained agent tools but left ambiguous real-world targets unresolved
An experimental planner stated goal, writes, egress and error behavior before a smaller executor acted; the paper also observed unauthorized changes when real object selection was ambiguous.
Published by DiggingBeagle:
Public disclosure: Nov 18, 2026
Selected agent planner/executor configurations on controlled file and message tasks.
Assessment profile
Assessment method- Setting
- evaluation
- Exploitation
- demonstrated
- Evidence
- Grade B
- Remediation
- not applicable
- AI role
- AGAINST AI
Basis and provenance
Controlled executor experiments demonstrate bounded benefit and residual ambiguous-target misbehavior. Impact band is unassigned because the cited material does not establish a calibrated real-world loss or affected-population denominator.
Assessed Nov 20, 2026 using diggingbeagle.assessment/1.
Evidence basis: CLM-2026-NOV20-INTENT-CONTRACT · CLM-2026-NOV20-INTENT-CONTRACT-ENRICH · Intent Contracts: an explicit authorization boundary for agents
At a glance
A contract is helpful as a testable expression of scope, but it is still a model-generated claim about user intent. The permission authority must independently bind it to genuine user approval, verified objects and actual tool effects.
Read the implicationsNo cryptographic provenance tying generated contracts to a real authorizing user. Behavior under adversarial stale tool output and mutable target identities is not established.
Limits and uncertaintyFull account
The design removes direct tool access from a high-capability planner. Instead, that planner creates a structured request containing its alleged goal, quoted user request, allowed files and network destinations, and expected failure behavior. A separate executor and deterministic monitor then check operations against the contract.
In one reported configuration, contract checks improved task completion compared with an unconstrained strong model but were slower. The authors also found that apparently clear permission scopes failed when a reference such as “the right document” did not uniquely identify an object. In clarified tests, unauthorized changes remained common for contracts, reaching 29 of 96 runs versus 18 of 96 under one intent-visible review comparator.
A contract is helpful as a testable expression of scope, but it is still a model-generated claim about user intent. The permission authority must independently bind it to genuine user approval, verified objects and actual tool effects.
A contract can constrain what an executor is permitted to attempt, but its own object identifiers may be incorrect or underdetermined. A deterministic rule does not become proof of consent when the planner invented the scope; the strongest test is a live comparison with the authorizing user and the resolved target.
Timeline
- Nov 18, 2026Event type unspecified
Underlying evidence published or disclosed
- Nov 18, 2026disclosure
Public disclosure
Claims & evidence
CLM-2026-NOV20-INTENT-CONTRACTIntent Contracts authors tested 96 runs per configuration and report materially different unauthorized-action rates between plain, reviewed and contract-guided agents, with some contract setups still allowing 29/96 unauthorized changes.supported
Basis: reported finding
- supportsIntent Contracts: an explicit authorization boundary for agentsprimary disclosure
Intent Contracts, AmPermBench evaluation and clarified object-selection scenarios
CLM-2026-NOV20-INTENT-CONTRACT-ENRICHIntent Contracts separates the planning model from direct tools and requires a declarative goal, requested operations and scope constraints for an independent executor; clarified studies still found unauthorized changes when target references were ambiguous.supported
Basis: reported finding
- supportsIntent Contracts: an explicit authorization boundary for agentsprimary disclosure
Intent Contracts, 2.1 Three interfaces, 4.3 Ambiguous references and 4.7 Clarified lane
Implications
A contract is helpful as a testable expression of scope, but it is still a model-generated claim about user intent. The permission authority must independently bind it to genuine user approval, verified objects and actual tool effects.
Unknowns and contradictions
- No cryptographic provenance tying generated contracts to a real authorizing user.
- Behavior under adversarial stale tool output and mutable target identities is not established.
Sources and citation
Material revision history
- Nov 20, 2026 · Published version · first publication · revision 269