Evidence · DiggingBeagle record
Intent Contracts: an explicit authorization boundary for agents
arXiv:2611.24025, planner/executor separation, deterministic scope checks, AmPermBench.
- Published
- Nov 18, 2026
- Source role
- primary disclosure
Evidence record
Claim-level citations (2)
- supportsIntent Contracts constrained agent tools but left ambiguous real-world targets unresolved: Intent Contracts authors tested 96 runs per configuration and report materially different unauthorized-action rates between plain, reviewed and contract-guided agents, with some contract setups still allowing 29/96 unauthorized changes.
Intent Contracts, AmPermBench evaluation and clarified object-selection scenarios
- supportsIntent Contracts constrained agent tools but left ambiguous real-world targets unresolved: Intent Contracts separates the planning model from direct tools and requires a declarative goal, requested operations and scope constraints for an independent executor; clarified studies still found unauthorized changes when target references were ambiguous.
Intent Contracts, 2.1 Three interfaces, 4.3 Ambiguous references and 4.7 Clarified lane