Evidence · DiggingBeagle record

Formalize or Lose It swarm requirement enforcement study

Original technical disclosure: Researchers audited an existing planner-worker agent scheduler, compared natural-language supervision against executable constraints and injected controlled faults through worker handoffs. The report counts 84 supervisory requirements, about 46% existing only in prompt text; six deterministic host checks caught five of six planted faults previously accepted by a 125-case test suite.

Source role
primary disclosure